Dodd Hall Chiller Renovations The Ohio State University, Wexner Medical Center Campus Columbus, Ohio
The Problem
OSU needed to replace two 242-ton centrifugal chillers on their medical campus.
The Solution
GTC worked in the fully occupied hospital to complete a state administered design-build within a phased construction plan. Not only did GTC complete the project as outlined, we helped save costs by scheduling our installation in stages to avoid the need for a temporary chiller during construction.
Our Installation Included
Demolition and design of new doors to the mechanical rooms
Replacement of the building’s two centrifugal chillers
Retrofit of the new chillers for cooling towers
Reconnection of existing chilled water and condenser piping
New refrigerant monitoring system, primary pumps, and building automation controls
Electrical work to connect chillers to existing power, including new switches, fuses and wiring